11KW 13KW Swimming Pool Heat Pumps
Categories | Swimming Pool Heat Pumps |
---|---|
Brand | Suoher Inverter Heat Pumps Manufacturer |
Model | SHPH-11CH SHPH-13CH |
Net dimensions | 1000*350*620(mm) |
Packing dimensions | 1030*360*750(mm) |
Fan motor | 40W |
Condenser | PVC+Titanium heat exchanger |
Low pressure switch | 0.02/0.15MPa |
FOB port | Rongqi, Shunde |
Terms of Payment | L/C, T/T |
Update Time | Nov 18,2024 |
|
Model |
|
SHPH-11CH |
SHPH-13CH |
SHPH-15CH |
---|---|---|---|---|---|
Specification |
Heating capacity* |
KW |
8.2 |
9.8 |
10.9 |
Heating power input* |
KW |
1.78 |
2.12 |
2.22 |
|
Rated current* |
A |
8.09 |
9.64 |
10.09 |
|
COP* |
|
4.61 |
4.62 |
4.91 |
|
Heating capacity** |
KW |
10.6 |
12.7 |
14.1 |
|
Heating power input** |
KW |
1.81 |
2.16 |
2.28 |
|
Rated current** |
A |
8.23 |
9.82 |
10.36 |
|
COP** |
|
5.86 |
5.88 |
6.18 |
|
Max. water temperature |
℃ |
40 |
|||
Rated water temperature |
℃ |
27 |
|||
Water flow |
m3/h |
3.80 |
4.40 |
5.30 |
|
Net weight |
kg |
105 |
110 |
131 |
|
Gross weight |
kg |
115 |
120 |
141 |
|
Noise |
db |
58 |
58 |
58 |
|
Water connections |
inch |
2" |
|||
Power supply |
|
220V/1PH/50Hz |
|||
Net dimensions |
mm |
1000*350*620 |
1110*460*700 |
||
Packing dimensions |
mm |
1030*360*750 |
1140*470*830 |
||
Standard components |
Compressor |
Brand |
LAMDA (GREE) |
||
Quantity |
1 |
||||
Condenser |
PVC+Titanium heat exchanger |
||||
Evaporator |
Hydrophilic aluminum foil + internal thread copper pipe |
||||
4-way valve |
Yes |
||||
Expansion valve |
Sanhua electronic expansion valve |
||||
Fan motor |
40W |
50W |
|||
Cabinet |
Galvanized white metal sheet |
||||
Controller |
Large LCD screen controller |
||||
High pressure switch |
4.2/3.6MPa |
||||
Low pressure switch |
0.02/0.15MPa |
||||
Working mode |
Heating and Cooling |
||||
Refrigerant |
R32 |
||||
Circulation pump |
No (Optional) |
||||
Remarks |
1. Unit working temperature : -10℃ to 43℃ 2. *Test condition: ambient temp: 15℃/11℃, water inlet: 27℃ **Test
condition: ambient temp: 24℃/19℃, water inlet: 27℃ 3. The above is the basic configuration. Water pump is not included in. 4. The above price is based on FOB Guangzhou. 5. The above price is calculated based on the current exchange rate, if the exchange rate fluctuation is over 0.5%,the price will be adjusted accordingly. 6. Payment term: 30% TT in advance, the rest is balanced before the shipment. 7. Delivery time: It depends on the condition of the material inventory, usually 10-30 working days. |
- Loading...
Get Heat Pump Quotation Now
- *Title
- *Content
Get Heat Pump Quotation Now
- *Title
- *Content